Isocost Line

Also known as · isocost

The set of input bundles (l,k)(l,k) with the same total cost c0c_0, i.e. pll+pkk=c0p_l l + p_k k = c_0. Its slope is −pl/pk-p_l/p_k.

When to use

In Cost Minimisation, find the lowest isocost that still touches the Isoquant; at an interior optimum the two are tangent.

See Lec 04.

Appears in

No references yet.